Product Overview
The Vesgantti 169" Large Modular Sectional Sofa is a Sofas & Couches product. It features cloud couch delivers cloud-like comfort: enjoy the generous 26-inch seat.
Key Features
- Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Four adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
- Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 142"W x 60"D x 35.5"H and seating for 2–4 people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
- Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this living room sofa will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
- Two Sets of Sofa Legs & Effortless Assembly: This 4 seater couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
- Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This L-shaped couch will be delivered in 3 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team
Why Choose the Vesgantti 169" Large Modular Sectional Sofa
The Vesgantti 169" Large Modular Sectional Sofa offers cloud couch delivers cloud-like comfort: enjoy the generous and fully modular design for customizable layouts: this modular. These features make the Vesgantti 169" Large Modular Sectional Sofa a strong option in the Sofas & Couches category.
Best For
The Vesgantti 169" Large Modular Sectional Sofa is best suited for: stretching out or curling up, all body types.
Quick Summary
The Vesgantti 169" Large Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Height: 21 Inches. Weight Limit: 2250 Pounds. Seating Capacity: 5. Price: $2474.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | No |
| Seat Height | 21 Inches |
| Weight Limit | 2250 Pounds |
| Seating Capacity | 5 |
| Product Dimensions | 60"D x 142"W x 35.5"H |
| Item Weight | 88 Pounds |
| Type | Sectional |
| Color | Corduroy - Beige |
| Style | Modern |
